Sidley Sports Ground Feasibility Study
A Feasibility Study was carried out in August 2018, following a recommendation made in the Rother and Hastings Playing Pitch Strategy (2016) that Sidley Sports Ground be specifically protected as playing pitch provision. The Study presents an options appraisal of the future use of the site, in order to inform the Development and Site Allocations (DaSA) Local Plan.
Open Space, Sport and Recreation Audit and Assessment
An Open Space, Sport and Recreation Audit and Assessment has been completed with the assistance of PMP consultants and in accordance with national planning guidance (PPG17).
Hastings and Rother Leisure Facilities Strategy
The Hastings and Rother Leisure Facilities Strategy was prepared by Capita Symonds for Rother District Council and Hastings Borough Council. The review was prepared by naa.
- Final Report Leisure Facilities Strategy 2009 to 2020
- Final Appendices Leisure Facilities Strategy 2009 to 2020
- Rother DC Leisure Facilities Strategy 2015-2025 RDC Final 16 August 2015
- Appendix 1 Assessment Report
- Appendix 2 Needs and Evidence Base
- Appendix 3 Consultations
If you are looking for the Health and Well-being version of our Leisure Facilities Strategy, this can be found on our Leisure Facilities Strategy page
Rother and Hastings Playing Pitch Strategy
The Rother and Hastings Playing Pitch Strategy was published in December 2016.