This page contains monthly updates on the Blackfriars Site published during 2023. Please visit our Monthly Updates webpage for updates posted in previous/subsequent years.

If you have any queries about the ongoing works or in the case of an emergency, please contact the Breheny Civil Engineering Site Agent, Mr Harayshan Pirabaharan, on Mob. 07399 528626. If you cannot get in touch, please contact the site engineer, Gareth Williams – 07747 017403 or the site foreman.

For any further queries about the housing scheme please contact rotherdchousingcompany@rother.gov.uk

Breheny Civil Engineering Ltd are planning to undertake and supervise the following works during this month:

  • Operating surface water runoff measures (weather dependent).
  • Field 3 embankment construction.

Christmas Shutdown Period

Please note that from 21/12/23 to 04/01/24 the site will be shut down for the Christmas holiday period. During this period visiting resource will be present on site to maintain the operation of the water treatment unit.

Breheny Civil Engineering Ltd are planning to undertake and supervise the following works during this month:

  • Road construction in Field 2 and Field 3.
  • Carriageway surfacing in Field 2 and Field 3.
  • Operating surface water runoff measures (weather dependant).

Breheny Civil Engineering Ltd are planning to undertake and supervise the following works during this month:

  • Field 2 & 3 drainage installation.
  • Tree clearance in Field 2 & 3 boundary.
  • Installation of utility ducting in Field 2 & 3.
  • Road construction in Field 2 & 3.

Breheny Civil Engineering Ltd are planning to undertake and supervise the following works during this month:

  • Drainage installation in Field 2 & 3

Breheny Civil Engineering Ltd are planning to undertake and supervise the following works during this month:

  • Management of surface water runoff involving the use of a water treatment system (dependent on weather conditions).
  • Demolition of the disused shed in Field 3 and removal of asbestos-contaminated materials (dependent on weather conditions).
  • Road construction and drainage installation in Fields 2 & 3
  • Soil muckaway from Field 3 via the Spinney.

Ahead of planning submission, Rother DC Housing Company is hosting a drop in public consultation event on Friday 9 June 2023 at Battle Memorial Hall, 81 High Street, Battle, East Sussex, TN33 0AQ from 3:30 – 7pm

Breheny Civil Engineering Ltd are planning to undertake and supervise the following works during this month:

  • Management of surface water runoff involving use of water treatment system (dependant on weather conditions).
  • Demolition of disused shed in Field 3 and removal of asbestos contaminated materials (dependant on weather conditions).
  • Continue new footway construction in Harrier Lane.
  • Drainage installation in Field 2.
  • Soil muckaway from Field 3 via the Spinney.

Breheny Civil Engineering Ltd are planning to undertake and supervise the following works during this month:

  • Management of surface water runoff involving use of water treatment system (dependant on weather conditions).
  • Demolition of disused shed in Field 3 and removal of asbestos contaminated materials (dependant on weather conditions).
  • Complete foul drainage installation in Harrier Lane and remove traffic management.
  • Commence new footway construction in Harrier Lane.
  • Earthworks in Field 2.
  • Drainage in Field 2.
  • Soil muckaway from Field 1.
  • Complete the footpath to the Spinney

Breheny Civil Engineering Ltd are planning to undertake and supervise the following works during this month:

  • Management of surface water runoff involving use of water treatment unit, which is anticipated to be operational throughout the winter months and subject to change dependant on weather conditions.
  • Japanese knotweed treatment works in Field 2 (subject to weather conditions).
  • Demolition of disused shed in Field 3 and removal of asbestos contaminated materials (subject to weather conditions).

Breheny Civil Engineering Ltd are planning to undertake and supervise the following works during this month:

  1. Management of surface water runoff involving use of silt treatment unit which is anticipated to be operational throughout the winter months and subject to change dependant on weather conditions.
  2. Demolition of disused shed in Field 3 and removal of asbestos contaminated materials (subject to weather conditions).

Anticipated Construction Works planned during January 2023: Breheny Civil Engineering Ltd are planning to undertake and supervise the following works during this month:

  1. Management of surface water runoff involving use of silt treatment unit which is anticipated to be operational throughout the winter months and subject to change dependant on weather conditions.